- Optimal Design of Geological CO2 Storage System using the Advanced Deep-Learning-based Automated Decision Support System
- Funding Source: National Research Foundation of Korea (NRF)
- Period: 2023.03 - 2027.02 (4 years 0 months)
- Principal Investigator: Prof. Baehyun Min
- Project No.: RS-2023-00208297
- Intelligent Proxy Model Development for Smart Prediction in CCUS Enabled Blue Hydrogen Project
- Funding Source: National Research Foundation of Korea (NRF)
- Period: 2022.11 - 2023.10 (1 year 0 months)
- Principal Investigator: Prof. Baehyun Min
- Project No.: 2022H1D3A2A01096314
- The Korean Green Taxonomy Guidelines (K-Taxonomy) Application Model Development Project
- Funding Source: Yoon&Yang LLC (Lawfirm Hwawoo)
- Period: 2022.11 - 2023.04 (0 year 6 months)
- Principal Investigator: Prof. Sanghoon Lee (Assistant Professor at EWU)
- Project No.: N/A
- Weather and Climate Data Convergence Analysis Specialized Graduate School
- Funding Source: Korea Meteorological Institute
- Period: 2022.06 - 2026.12 (4 year 7 months)
- Principal Investigator: Prof. Changhyun Yoo (Associate Professor at EWU)
- Project No.: N/A
- Frontier-1.5D
- Funding Source: Hanwha Total Energies
- Period: 2022.06 - 2023.05 (1 year)
- Principal Investigator: Prof. Baehyun Min
- Project No.: N/A
- Development of Packaging Design and Integrated Demonstration Technology for Oil Production Plant
- Funding Source: Ministry of Land, Infrastructure and Transport (MOLIT)
- Period: 2022.04 - 2028.12 (6 years 9 months)
- Principal Investigator: Dr. Young Ju Kim (Director at KIGAM)
- Project No.: RS-2022-00143644
- Development on Improvement of CO2 Storage Efficiency Technology
- Funding Source: Ministry of Trade, Industry and Energy (MOTIE)
- Period: 2021.11 - 2025.10 (4 years)
- Principal Investigator: Prof. Baehyun Min
- Project No.: 20212010200010
- Building Conceptual Design for Mid-size Integrated CCS Demonstration
- Funding Source: Ministry of Trade, Industry and Energy (MOTIE)
- Period: 2021.04 - 2023.12 (2 years 9 months)
- Principal Investigator: Dr. Hoseob Lee (Korea National Oil Corporation)
- Project No.: 20214710100060
- Optimization of Operating Conditions and Well Deployment for the Dual-tubing CCS System with Horizontal Wells Considering Storage Security and Economics
- Funding Source: National Research Foundation of Korea (NRF)
- Period: 2021.03 - 2026.02 (5 years)
- Principal Investigator: Dr. Min Kim (ESL Research Professor at EWU)
- Project No.: 2021R1C1C2013852
- Machine Learning-based Analysis on Gas Hydrate
- Funding Source: Korea Institute of Geoscience and Mineral Resources (KIGAM)
- Period: 2021.03 - 2023.12 (2 years 10 months)
- Principal Investigator: Prof. Kyungbook Lee (Assistant Professor at Kongju National Univ.)
- Project No.: GP2021-010
- Development of Cascading Outages and Restorations Strategies of Power System considering Non-Synchronous Generators
- Funding Source: Korea Electric Power Corporation Research Institute (KEPRI)
- Period: 2021.02 - 2024.01 (3 years)
- Principal Investigator: Prof. Jin Hur (Associate Professor at EWU)
- Project No.: R21XO01-1
- A Study on Connection between Long-Term Earth's Climate Change and Short-term Regional Environmental Change
- Funding Source: National Research Foundation of Korea (NRF)
- Period: 2018.06 - 2027.02 (9 years)
- Principal Investigator: Prof. Yongsang Choi (Professor at EWU)
- Project No.: 2018R1A6A1A08025520